Dependant on proposed
use of the road would depend on the specification
of the construction of the roadway. The heavier
the traffic proposed, would depend on thicknesses
and specification of sub base. As with sub bases
the thickness and specification of macadam’s
would also vary.
The majority of roadways would
need to be constructed using a retaining curb
or edging, again dependant on traffic expected
would depend on specification of curbs and edgings.
Timescale for completion:
Depending on the size of the
area will depend on how long the job will take.
|