Dependant on the
size of the area, macadam’s will be laid
by either hand or machine. If hand laid macadam’s
are laid to levels and falls with wooden squeegees
and rolled with pedestrian or ride on rollers.
If laid by machine, macadam’s will be laid
through the paver to levels and falls and rolled
with a ride on roller.
Typical sizes:
Sizes of car parks vary; it is
possible to surface any sized area.
Timescales for completion:
Depending on the size of the
area will depend on how long the job will take.
How long will they last:
Asphalt usually has a very long
life expectancy between 10 to 30 years, depending
on use and wear.
FAQ's:
How soon can we use the
area? Depending on the specification
and time of year between 1 day and 1 week.
How long will the job
take? Depending on the size of the area
will depend on the time taken to complete the
works. |